OEE measures the percentage of planned production time that is truly productive. Many manufacturing lines are only 60% productive, meaning there are tremendous opportunities for improvement.

What Is OEE?

OEE (Overall Equipment Effectiveness) is a “best practices” metric that identifies the percentage of planned production time that is truly productive. An OEE score of 100% represents perfect production: manufacturing only good parts, as fast as possible, with no downtime.

OEE is useful as both a benchmark and a baseline:

  • As a benchmark, OEE can be used to compare the performance of a given production asset to industry standards, to similar in-house assets, or to results for different shifts working on the same asset.
  • As a baseline, OEE can be used to track progress over time in eliminating waste from a given production asset.

OEE Benchmarks

So, as a benchmark, what is considered a “good” OEE score? What is a world-class OEE score?

  • 100% OEE is perfect production: manufacturing only good parts, as fast as possible, with no stop time.
  • 85% OEE is considered world class for discrete manufacturers. For many companies, it is a suitable long-term goal.
  • 60% OEE is fairly typical for discrete manufacturers, but indicates there is substantial room for improvement.
  • 40% OEE is not at all uncommon for manufacturing companies that are just starting to track and improve their manufacturing performance. It is a low score and in most cases can be easily improved through straightforward measures (e.g., by tracking stop time reasons and addressing the largest sources of downtime – one at a time).

Understanding OEE in Lean Manufacturing (3)

Understanding OEE in Lean Manufacturing (4)

Understanding OEE in Lean Manufacturing (5)

Simple OEE Calculations

So how is the OEE score calculated?

In simplest terms, OEE is the ratio of Fully Productive Time to Planned Production Time. In practice, OEE is calculated as:

OEE = (Good Count × Ideal Cycle Time) / Planned Production Time

Let’s define some terms used in the OEE Formula:

  • Good Count: pieces that are manufactured without any defects
  • Ideal Cycle Time: the theoretical fastest possible time to manufacture one piece
  • Planned Production Time: the total time that the production asset is scheduled for production
  • Fully Productive Time: producing only good pieces, as fast as possible, with no stop time

The Manufacturing Productivity Improvement Device That Feels Like MagicIn less than 8 hours you can benefit from automated, real-time accurate data.

Learn About Vorne XL

Understanding OEE in Lean Manufacturing (6)

Understanding OEE in Lean Manufacturing (7)

35,000+Installations

45+Countries

$3,990One-Time Cost

8Hours to Deploy

50+Years in Business

8Hours to Deploy

50+Years in Business

Preferred OEE Calculation

The preferred way to calculate OEE is mathematically equivalent to the simple formula described above but provides a much richer understanding of waste in the manufacturing process by breaking it down into three factors:

  • Availability Loss
  • Performance Loss
  • Quality Loss

Understanding OEE in Lean Manufacturing (8)

Understanding OEE in Lean Manufacturing (9)

Understanding OEE in Lean Manufacturing (10)

Availability Calculation

Availability takes into account Availability Loss, which includes all events that stop planned production for an appreciable length of time (typically several minutes or longer). Availability Loss includes Unplanned Stops (such as equipment failures and material shortages), and Planned Stops (such as changeover time).

Availability is calculated as the ratio of Run Time to Planned Production Time, where Run Time is simply Planned Production Time less Stop Time:

Availability = Run Time / Planned Production Time

Where Run Time = Planned Production Time − Stop Time

Performance Calculation

Performance takes into account Performance Loss, which includes all factors that cause the production asset to operate at less than the maximum possible speed when running (including Slow Cycles and Small Stops).

Performance is calculated as the ratio of Net Run Time to Run Time. In practice, it is calculated as:

Performance = (Ideal Cycle Time × Total Count) / Run Time

Ideal Cycle Time is the theoretical fastest possible time to manufacture one piece. Therefore, when it is multiplied by Total Count the result is Net Run Time – the theoretical fastest possible time to manufacture the total quantity of pieces.

Here is a simple example of a Performance calculation:

ItemValueExplanation
Ideal Cycle Time1 minuteTheoretical fastest time to produce this part.
Total Count300Total quantity of pieces manufactured during this shift.
Run Time330 minutesRun time of this shift (planned production time less stop time).
Performance90.9%(Ideal Cycle Time × Total Count) / Run Time = (1 × 300) / 330

Quality Calculation

Quality takes into account Quality Loss, which factors out manufactured pieces that do not meet quality standards, including pieces that are later reworked.

Quality is calculated as the ratio of Fully Productive Time (only Good Count manufactured as fast as possible with no Stop Time) to Net Run Time (fastest possible time for Total Count). In practice, it is calculated as:

Quality = Good Count / Total Count

OEE Calculation

OEE takes into account all losses (Stop Time Loss, Speed Loss, and Quality Loss), resulting in a measure of truly productive manufacturing time.

OEE is calculated as the ratio of Fully Productive Time to Planned Production Time. In practice, it is calculated as:

OEE = Availability × Performance × Quality

If the equations for Availability, Performance, and Quality are substituted in the above equation and then reduced to their simplest terms the result is:

OEE = (Good Count × Ideal Cycle Time) / Planned Production Time

This is the “simplest” OEE calculation described earlier. With a bit of reflection, it can be seen that multiplying Good Count by Ideal Cycle Time results in Fully Productive Time (manufacturing only good parts, as fast as possible, with no stop time).

Perfect Production

Earlier, an OEE score of 100% was described as perfect production: manufacturing only good parts, as fast as possible, with no stop time. Let’s tie this notion of perfect production to the OEE calculation:

  • Manufacturing only good parts means a Quality score of 100%
  • As fast as possible means a Performance score of 100%
  • With no stop time means an Availability score of 100%

Working through real-world examples is a great way to master the OEE calculation. For free worked examples, templates, spreadsheets, and other resources visit: https://www.oee.com/.

Plant Floor Metrics

OEE is a great tool for managers, but for plant floor employees it can be a bit abstract. Plant floor employees will perform best when they are given goals that are real-time, easily interpreted and highly motivational. A good example of an effective set of plant floor metrics is TAED:

  • Target: a real-time production target driven by the planned rate of production
  • Actual: the actual production count
  • Efficiency: the ratio of Target to Actual; how far ahead or behind production is running in terms of a percentage
  • Downtime: accumulated unplanned stop time for the shift updated in real-time; this keeps a strong focus on a key actionable improvement area

Download Free Lean Tools

Understanding OEE in Lean Manufacturing (2024)
Top Articles
Where to live in Utrecht
Tristate-Logik, Grundlage, Praxis (74HC125 74HC126 74HC00 74HC245 74HC533 Bus-Schaltung)
Bild Poster Ikea
Top Financial Advisors in the U.S.
When is streaming illegal? What you need to know about pirated content
Miss Carramello
How Far Is Chattanooga From Here
Mr Tire Rockland Maine
CA Kapil 🇦🇪 Talreja Dubai on LinkedIn: #businessethics #audit #pwc #evergrande #talrejaandtalreja #businesssetup…
What is IXL and How Does it Work?
Tamilblasters 2023
Dumb Money
Bernie Platt, former Cherry Hill mayor and funeral home magnate, has died at 90
Michaels W2 Online
A rough Sunday for some of the NFL's best teams in 2023 led to the three biggest upsets: Analysis - NFL
Craigslist Farm And Garden Cincinnati Ohio
Suffix With Pent Crossword Clue
Hilo Hi Craigslist
State HOF Adds 25 More Players
Simpsons Tapped Out Road To Riches
Tamilrockers Movies 2023 Download
Craighead County Sheriff's Department
Dallas Craigslist Org Dallas
Kaitlyn Katsaros Forum
Allybearloves
Craigslist Panama City Beach Fl Pets
Cinema | Düsseldorfer Filmkunstkinos
Martins Point Patient Portal
Otis Inmate Locator
Fastpitch Softball Pitching Tips for Beginners Part 1 | STACK
Tmj4 Weather Milwaukee
Kokomo Mugshots Busted
Tendermeetup Login
The Boogeyman Showtimes Near Surf Cinemas
Tds Wifi Outage
Weather Underground Bonita Springs
Henry Ford’s Greatest Achievements and Inventions - World History Edu
511Pa
Tedit Calamity
Ethan Cutkosky co*ck
Yourcuteelena
N33.Ultipro
The Blackening Showtimes Near Ncg Cinema - Grand Blanc Trillium
Maplestar Kemono
Lesson 5 Homework 4.5 Answer Key
Suppress Spell Damage Poe
Washington Craigslist Housing
Pilot Travel Center Portersville Photos
Grace Charis Shagmag
Overstock Comenity Login
Jesus Calling Oct 6
Predator revo radial owners
Latest Posts
Article information

Author: Twana Towne Ret

Last Updated:

Views: 6430

Rating: 4.3 / 5 (64 voted)

Reviews: 95% of readers found this page helpful

Author information

Name: Twana Towne Ret

Birthday: 1994-03-19

Address: Apt. 990 97439 Corwin Motorway, Port Eliseoburgh, NM 99144-2618

Phone: +5958753152963

Job: National Specialist

Hobby: Kayaking, Photography, Skydiving, Embroidery, Leather crafting, Orienteering, Cooking

Introduction: My name is Twana Towne Ret, I am a famous, talented, joyous, perfect, powerful, inquisitive, lovely person who loves writing and wants to share my knowledge and understanding with you.